Author: RS Reggie Home 2

Time to Reggie-fy

Hello from Reggie’s Home team! After demoing the existing structure on our site, the past two weeks we have been sorting the wood from the rest of the construction materials. We have only put the construction materials in the dumpster in order to maximize the used space and have taken the wood off site.

Aerial view of site after demolition

Along with finishing clearing off our site, we have been busy with reviews every Friday. On October 25th we had a review with Ada and Giuseppe from Lot-ek in New York City. Through this presentation our team was given advice on how to present our research and case studies to the scale of our project. They also helped us realized that we needed to start thinking about what Reggie envisions and approach our design in an unconventional way.

Presenting to Lot-ek

For our BIG HALLOWEEN REVIEW we had Marlon Blackwell, Katrina Van Valkenburgh, and Mike Newman come to Newbern. After taking them on a journey from space to Reggie’s property we got a lot of insight on how to begin our design. One of the key factors was to take the concepts of our case studies and apply them to fit Reggie’s needs (Reggie-fy them).

We also had our annual pumpkin carve!
Building our costumes
Presenting for Halloween Reviews

We plan to start our design by looking at Reggie’s desire to live outside and starting our narrative from there.

This week we will get our dumpster off site and finally begin our site survey!! When not on site we will continue to Reggie-fy our case studies and get our design juices flowing.

Reggie-fying our case studies

That’s all we have for now! See you next week!

Reggie’s Home Team

It’s Demo Time!

Reggie’s Home Team really tore the house down this week! With the help of our “5th teammate,” Mason, and the Bobcat, what was once a standing structure is now a pile of debris in the middle of the site.

Before we demoed the house

In order to make the best use of time and tools, the team had a dumpster delivered to site to make the removal of old construction material quicker. To reduce the amount of waste added to the dumpster, we only put building material in the dumpster and separated the wood to burn.

We used burn barrels for the smaller wood scraps
Reggie’s temporary home

In addition to being on site we also prepared a presentation for Kim Clements and Joe Schneider from JAS Design Build. This presentation allowed us to receive suggestions on how to approach site analysis once the site is clear. Joe and Kim also directed us to search for case studies that are more similar to the size and scope of the project.

That is all we have for now

Coming soon: The biggest burn pile Hale County has seen and a clear site!

After we demoed the house

Reggie’s Home Team