Testing, Testing…

As the team prepared to start installing the walkway structure, a pull-out load test done in order to understand the strength of the brick, and its relationship to the HILTI anchors. The team installed two anchors with washers and nuts at different locations on the wall and tested both to failure load….and they passed!!

Shortly before the team left for Birmingham, the electrical was roughed in. This week, thanks to Mason’s help, it finally became live!

The color for the block walls has been decided, soon be painted grey ( second from the left)